Completed work:


Work to replace the emergency section of the sewage system with a diameter of 200 mm with a length of 33 meters with a change in pipe of the diameter by 225 mm on the street Petre Melikishvili, Tbilisi.

Completed work. KOMBEST

Work to replace the emergency section of the sewage system with a diameter of 200 mm with a length of 42 meters with an expansion of the diameter of 225 mm on the street Sergo Zakariadze, Tbilisi.    

Completed work. KOMBEST

Trenchless replacement of a reinforced concrete pipe 500mm with 500mm SDR 17 polyethylene pipe by destruction method.  

Completed work. KOMBEST

Replacement of eight sections of 160 mm diameter sewerage system in Zugdidi, Georgia, on Lomonosov Street for the German company “Ludwig Pfeiffer”. 

Completed work. KOMBEST

Replacement of the output in an apartment building with an increase in diameter from 160 mm to 225 mm.  

Completed work. KOMBEST

Work on laying a new pipeline 160 mm in diameter under a two-lane road 20 meters long in Rustavi, Georgia.   

Completed work. KOMBEST

Presentation. Demonstration work for “Georgian Water and Power” (GWP) for the replacement of the emergency sewerage in the busy section of Rafael Agladze Street. The pipeline was successfully replaced with a length of 14 meters and a diameter of 225 mm in 1.5 hours.  

Completed work. KOMBEST

Work to replace the emergency section of a 35-meter pipeline with a diameter of 300 mm on the street. Teaching, Novosibirsk. The work was carried out at a temperature of -35 degrees.    

Completed work. KOMBEST